  References   ČEZ Power station, Mělník

Project to reduce emissions during boiler operation; DITHERM has provided the complete assembly of a semi-rigid liner for OFA, AGA and SNCR tube deflections, as well as dismantling and mounting of semi-hard linings for burners. Chemically bonded materials were used to accelerate the aggregate uptake (without final drying). During the project, there were major design changes that DITHERM was able to adapt in a short time, both in the organization of work and its quality. In 2014–2015