GENERAL REPAIR of lining for combustion furnace and steam boiler at position N8, incl. material delivery, project documentation and execution of lining tempered to 300 °C by external sources. This was an emergency repair, with the fact that only 3 weeks had elapsed from the customer’s call until the start of the event, during which time we managed to provide approx. 35,000 pieces of acid-resistant and insulating form material to design the project documentation, and to provide logistics and personnel for the entire construction. We realized the project in a record time of 24 calendar days.